Here is a checklist for the required documents and the steps to complete the data verification process.
PRO TIP- you can generate the Verification Checklist yourself and ensure that the data and documents match before enlisting a verifier. This makes it a quick and cost-effective process.
Required Documents Checklist
While performing your yearly benchmarking, keep and organize the following documents to share with your chosen Data Verifier:
- Building Documentation: Collect blueprints, as-built drawings, or other official documents to verify the total Gross Floor Area.
- Property Address List: A complete list of all addresses and/or individual units within the property.
- Utility Bills: Copies of all utility bills (for all fuel types) for the entire verification year.
- Meter Information: The total number of utility meters, categorized by fuel type.
Verification Process Checklist
The verification process is completed electronically through Energy Star Portfolio Manager (ESPM).
- Step 1: Connect with a Verifier in ESPM.
- Confirm your selected Data Verifier has an ESPM account.
- Add the verifier as a contact in your ESPM account using their username or email.
- Wait for the verifier to accept your connection request.
- Step 2: Share Your Property.
- From your ESPM dashboard, share your property with the connected verifier.
- Grant them “Full Access” to allow them to review data and complete the required checklist.
- Step 3: Verifier Reviews Data & Completes Checklist.
- The verifier will generate the “Data Verification Checklist” from the Reporting tab in their ESPM account.
- They will review your building’s data for accuracy.
- If errors are found, the verifier will work with you to make corrections in ESPM.
- The verifier will sign the final page of the checklist.
- Step 4: Final Electronic Submission.
- The Data Verifier will enter their credentials into the “Verification” section of your property’s “Details” tab in ESPM.
- Once the verifier saves this information, the process is complete and the verification is automatically submitted.